Late B2B invoices in Cyprus: due dates, interest and the €40 recovery sum

Cyprus B2B late-payment guide: work out the due date, H2 2026 interest at 10.40%, the €40 recovery sum and a defensible invoice file.

Zeno · Editorial · Updated · 17 min read
Credit controller reviews an invoice and payment timeline while speaking on the phone
Table of contents
  1. Confirm that the debt is a covered commercial transaction
  2. Test the legal conditions before adding interest
  3. Find the due date from the contract or the statutory fallback
  4. Check whether acceptance can legitimately move the clock
  5. Use the separate rules when a public authority owes the money
  6. Use the rate fixed for each half-year
  7. Calculate simple interest on the overdue amount and days
  8. Apply the €40 recovery sum once per qualifying transaction
  9. Do not charge interest on sums not yet overdue
  10. Check whether a long term or waiver is grossly unfair
  11. Build a file that another person can audit
  12. Choose a complaint, negotiation or claim on the facts
  13. Sources

An overdue business invoice does not become a valid interest claim merely because accounting software labels it late. Cyprus Law 123(I)/2012, as amended by Law 227(I)/2022, applies to qualifying commercial transactions and ties interest to performance, a defensible due date and debtor responsibility. For 1 July–31 December 2026 the Cyprus Ministry announces a statutory annual rate of 10.40%, while its 10.15% rate applied to the first half of 2026. This guide explains how to calculate and evidence interest, the fixed €40 recovery amount and sensible next steps.

Confirm that the debt is a covered commercial transaction

Law 123(I)/2012 defines a commercial transaction as one between undertakings, or between an undertaking and a public authority, that leads to delivery of goods or provision of services for remuneration. An undertaking includes an organisation acting independently in an economic or professional activity, even if one person conducts it. This guide concentrates on the business-to-business route in Section 5; transactions with a public authority as debtor have distinct rules in Section 6. A consumer purchase, personal loan, unpaid wage or damages award does not become a commercial invoice simply because it is recorded in the same ledger. Start by identifying the actual customer, the agreed supply and the nature of the payment rather than assuming the debtor's trading name settles scope.

Sections 3 and 4 set boundaries. The law applies to remunerative payments within commercial transactions, subject to exclusions for debts already within bankruptcy or liquidation proceedings begun against the debtor under the relevant laws, and for contracts concluded before this law took effect. Check those facts for an old or distressed account before using this particular statutory route. A cross-border contract raises an additional governing-law question: the fact that a supplier is based in Cyprus does not alone prove that Cyprus's statutory rate governs every foreign customer's debt. None of these checks decides whether the principal is actually owed; establish the contract, supply, invoice and any valid credit separately.

Basis and guidance: CyLaw consolidated Cyprus Law 123(I)/2012, including Law 227(I)/2022; EUR-Lex: Directive 2011/7/EU on late payment

Test the legal conditions before adding interest

Under Section 5(1), a B2B creditor is entitled to late-payment interest without sending a formal reminder when two conditions are met: the creditor has fulfilled its contractual and legal obligations, and the amount due has not arrived on time, unless the debtor is not responsible for the delay. The entitlement therefore is not an automatic charge on every balance marked overdue. Keep evidence of the order, accepted terms, delivery or service completion, and any agreed milestone. If the buyer says that goods were defective or services incomplete, investigate that objection on its facts. A dispute does not mechanically erase an interest claim, but an unresolved issue about the creditor's own performance may change the legal analysis.

Separate a genuine performance dispute from an accounts-payable mismatch. For example, a valid invoice addressed to the wrong purchase-order code may remain unpaid while the customer's finance team searches for it. Correct the reference and preserve the original receipt trail. If the contract required a certificate, acceptance record or properly formatted request for payment, gather it and identify when the condition was met. Interest begins only against a principal that should have been paid under the applicable date rule; it should not be calculated on an unapproved extra work item or a cancelled quantity. The creditor need not send a reminder to create the statutory entitlement, but a clear and measured reminder often resolves an administrative problem faster than immediate escalation.

Basis and guidance: CyLaw consolidated Cyprus Law 123(I)/2012, including Law 227(I)/2022

Find the due date from the contract or the statutory fallback

Where the contract fixes a payment date or period, Section 5(3)(a) provides for interest from the day after that date or the end of that period, provided the Section 5(1) conditions are met. Read the signed contract and incorporated purchase terms, not only the date printed on an invoice. A supplier's unilateral 'due in seven days' line may not override a properly agreed thirty-day term. The B2B period fixed in a contract should not exceed sixty calendar days unless a different period was expressly agreed in the contract and is not grossly unfair to the creditor under Section 9. This is a conditional limit, not a free right for a buyer to impose ninety days through a portal setting.

If no contractual payment date or period was fixed, Section 5(3)(b) supplies factual thirty-calendar-day triggers. The ordinary trigger is receipt by the debtor of the invoice or equivalent payment request. If that receipt date is uncertain, use receipt of the goods or provision of services. If the buyer received the invoice before the goods or services, the period runs from receipt of goods or provision of services. Where a contractual or legal acceptance or verification procedure applies and the invoice was received by or before acceptance, the period is measured from acceptance or verification. The correct route depends on evidence, not convenience. Record invoice transmission and receipt, delivery, acceptance and the selected rule in a dated calculation sheet.

Basis and guidance: CyLaw consolidated Cyprus Law 123(I)/2012, including Law 227(I)/2022; EUR-Lex: Directive 2011/7/EU on late payment

Check whether acceptance can legitimately move the clock

Section 5(4) limits a contractual or statutory acceptance or verification procedure to thirty calendar days from receipt of goods or services, unless the contract expressly provides otherwise and the longer period is not grossly unfair to the creditor. Such a procedure concerns conformity with the contract; it is not an unlimited internal approval queue. If a customer relies on 'pending sign-off' for months, ask which contractual clause establishes the procedure, when the goods or service were received, what objective verification was performed and when acceptance occurred. Keep evidence such as delivery notes, timesheets, completion certificates, dated reports and correspondence. A default administrative delay should not silently reset the legal starting point.

Consider a hypothetical software-services engagement. The contract says the customer will verify a completed milestone, and the supplier sent its invoice on the day the milestone report was delivered. To calculate default interest, examine the real acceptance process and Section 5(3)(b)(iv), rather than assuming the invoice date or the date of a later bookkeeping stamp decides the matter. If the customer raises a timely, substantiated defect, assess whether the agreed service was actually performed and whether part of the price is genuinely contested. If only a minor, separable item is disputed, reconcile the undisputed balance and any credit note before calculating interest. The aim is a documented due date for each amount, not a formula chosen after the debtor refuses to pay.

Basis and guidance: CyLaw consolidated Cyprus Law 123(I)/2012, including Law 227(I)/2022

Use the separate rules when a public authority owes the money

A public authority debtor is not an ordinary B2B customer under the statute. Section 6 generally uses thirty-calendar-day payment periods linked to invoice receipt, goods or services, or acceptance. The identity of the public body matters: a limited sixty-day extension is available for specified public authorities carrying on industrial or commercial economic activity under the stated conditions and for appropriately recognised public bodies providing healthcare. Section 6 also has restrictions on contractually extending the period; any exception must be express, objectively justified by the particular contract and never exceed sixty calendar days. Do not apply a generic 'public sector always pays in sixty days' policy to every ministry, municipality or statutory organisation.

The interest conditions remain tied to the creditor's performance, non-payment and debtor responsibility, and Section 6 points to statutory interest. If a public customer has an acceptance procedure, identify the special conditions in Section 6(5) and the contract or tender documents. The Court of Justice in BFF Finance Iberia also rejected a national approach that generally stacked thirty days for acceptance on top of thirty days for payment to make sixty days for all public transactions. This guide's detailed workflow is for B2B suppliers; when the debtor is a public authority, switch to a Section 6 calculation and review procurement documents before a demand.

Basis and guidance: CyLaw consolidated Cyprus Law 123(I)/2012, including Law 227(I)/2022; Court of Justice: BFF Finance Iberia, C-585/20

Use the rate fixed for each half-year

The statutory rate is simple annual interest at the applicable ECB main refinancing reference rate plus eight percentage points. Under Section 5(2), the reference rate in force on 1 January is used for the first half of the year and the rate in force on 1 July for the second half. The Cyprus Ministry of Energy, Commerce and Industry's official announcement for 1 July–31 December 2026 gives a 2.40% reference rate and a 10.40% statutory late-payment rate. Its preceding announcement gives 2.15% and 10.15% for 1 January–30 June 2026. The ECB's published rate history confirms the main refinancing rate rose to 2.40% effective 17 June 2026. Use the applicable half-year notice rather than carrying the earlier 10.15% rate into the second half.

The half-year reference mechanism means a mid-September ECB change does not automatically replace the rate fixed on 1 July for July–December late-payment days. Equally, a debt outstanding across 30 June and 1 July should be calculated in separate date segments at the respective rates, not at the newest rate for the whole debt. A future rate should be verified from the Ministry's next notice before a claim covering a later period is issued. If the businesses agreed a different late-payment rate, Section 2 and Section 9 require analysis of that clause and whether it is grossly unfair; do not automatically substitute the statutory number without reading the contract. Keep a rate source, effective interval and arithmetic in the file.

Basis and guidance: CyLaw consolidated Cyprus Law 123(I)/2012, including Law 227(I)/2022; Cyprus Ministry: official late-payment rate announcement, July–December 2026; European Central Bank: official key interest-rate history

Calculate simple interest on the overdue amount and days

The statutory definition uses simple, not compound, interest, and the Ministry says late-payment interest should be calculated daily. The law defines the 'amount due' as the principal payable within the contractual or statutory period, including applicable taxes, duties, fees or charges specified in the invoice or equivalent demand. The Court of Justice confirmed in BFF Finance Iberia that VAT shown on an invoice may be included in the amount due for this purpose even if the creditor had not yet remitted that VAT to the tax authority when default began. This does not license interest on fictitious VAT, an invalid invoice or sums removed by a credit note. Reconcile the actually outstanding amount before calculating each period.

A transparent illustration for a qualifying H2 2026 invoice with €10,000 overdue for twenty documented days is €10,000 × 10.40% × 20/365 = €56.99 of simple interest, using a 365-day convention for this non-leap year. If the fixed recovery sum is also due for that transaction, the illustrative accessories total €96.99 before any proven additional costs; the €10,000 principal remains separate. This is an example, not a substitute for checking the correct first and final day, contract terms, leap-year convention if relevant, credits and payments. A partial payment reduces the overdue principal for subsequent days. Show dates, rate, outstanding principal and rounding in a separate schedule so the debtor can reproduce the number.

Basis and guidance: CyLaw consolidated Cyprus Law 123(I)/2012, including Law 227(I)/2022; Cyprus Ministry: official late-payment rate announcement, July–December 2026; European Central Bank: official key interest-rate history; Court of Justice: BFF Finance Iberia, C-585/20

Apply the €40 recovery sum once per qualifying transaction

Section 8(1) entitles the creditor to a fixed €40 for recovery costs when late-payment interest becomes payable under Section 5 or 6; no reminder is necessary. Section 8(2) permits reasonable compensation for remaining recovery costs above the fixed amount caused by the delay, such as necessary lawyer or collection-agency expenses. This is not an arbitrary €40 charge every week or a fee that can be added to a consumer bill under this commercial statute. Show the fixed amount and any claimed additional costs separately from principal and interest. Keep invoices or records for the additional costs and avoid charging twice for work already compensated by the fixed sum.

The Court of Justice in BFF Finance Iberia interpreted Article 6 of Directive 2011/7/EU to make the €40 minimum payable for each unpaid-on-time commercial transaction evidenced by an invoice, even when several invoices are pursued in one claim. The claimant must still connect each invoice to its underlying transaction and establish the conditions for late-payment interest. For example, five distinct qualifying supply invoices submitted together can support five fixed amounts, but a supplier should not manufacture multiple invoice numbers for one payment obligation just to multiply compensation. The same judgment says a single combined claim can matter when assessing whether additional recovery costs beyond the fixed amounts are reasonable.

Basis and guidance: CyLaw consolidated Cyprus Law 123(I)/2012, including Law 227(I)/2022; EUR-Lex: Directive 2011/7/EU on late payment; Court of Justice: BFF Finance Iberia, C-585/20

Do not charge interest on sums not yet overdue

Section 7 allows the parties, subject to Cypriot law, to agree a schedule of instalments. If an instalment is not paid on its agreed date, the law says interest and compensation are calculated exclusively on amounts that are overdue. A €12,000 price payable as three €4,000 instalments does not generate interest on all €12,000 when only the first €4,000 is late and the other due dates have not arrived. Build a schedule for each instalment: agreed date, amount, payments actually received and days in delay. This is especially important for retainers, staged construction work and recurring services, where a single customer statement may group many different transactions and payment obligations.

Part-payments can also change the daily interest base. Suppose a qualifying €10,000 invoice is overdue, and the customer pays €6,000 after ten days. Subject to allocation and any contract terms, a calculation should no longer treat the whole €10,000 as unpaid for the following days. Reconcile whether the payment was earmarked for that invoice, a different invoice or agreed interest before applying it. Record credit notes and returned goods with dates and reasons. This disciplined approach prevents an inflated demand and makes it easier to identify what part of the account remains genuinely contested. The €40 question follows each qualifying late commercial transaction, not a weekly recalculation of the changing ledger balance.

Basis and guidance: CyLaw consolidated Cyprus Law 123(I)/2012, including Law 227(I)/2022; Court of Justice: BFF Finance Iberia, C-585/20

Check whether a long term or waiver is grossly unfair

A buyer may present standard terms with ninety-day payment, 'no late interest' and 'no collection fee'. Do not assume the supplier's signature ends the analysis. Section 5(5) permits a B2B contractual payment period beyond sixty days only where expressly agreed in the contract and not grossly unfair to the creditor. Section 9 assesses terms or practices concerning payment date, interest or recovery compensation against all circumstances, including serious departure from good commercial practice, the goods or services involved and objective reasons for deviating from the statutory position. A grossly unfair term may be unenforceable or give rise to damages. Review the exact wording and bargaining context before taking a position.

Section 9(2) treats a term or practice excluding late-payment interest as grossly unfair, and Section 9(3) does the same for exclusion of Section 8 recovery compensation. That is stronger than a vague suggestion that any agreed waiver is acceptable. Still, do not tell every supplier to ignore a signed contract without reviewing facts, governing law, the term's operation and any dispute. The statute also distinguishes B2B contract rates from the statutory rate, subject to the unfairness provisions. Draft future payment terms with a clear due-date event, evidence of invoice receipt and a measured acceptance process. A vague rule that payment begins only after the buyer's internal approval creates avoidable conflict over when the clock started.

Basis and guidance: CyLaw consolidated Cyprus Law 123(I)/2012, including Law 227(I)/2022; EUR-Lex: Directive 2011/7/EU on late payment

Build a file that another person can audit

Collect the contract, order, applicable purchase terms and any later agreed change. Match each invoice to delivery notes, service reports, acceptance records, timesheets or correspondence proving performance. Preserve evidence of when an invoice or equivalent request reached the debtor; a sent-mail screenshot may show dispatch but not always receipt. Create a ledger of invoice number, original amount including applicable tax, due-date basis, credit notes, part-payments, outstanding principal, interest start date, half-year rate periods, days and the fixed recovery sum. Separate any reasonable additional recovery costs and attach their supporting records. A clear file makes it possible to resolve a simple accounts-payable error without misdescribing the legal claim.

A demand can state the factual basis and give a useful route for the debtor to identify an error. Name the supply and invoice, explain the due date, set out principal, interest by period and €40 amount, and invite a reasoned response about any disputed item. If the buyer says the purchase-order number is wrong, correct administrative data while preserving the original contract and delivery trail. If the customer alleges nonconformity, ask for details and assess the undisputed part separately. Be proportionate about deadlines and collection cost. The statutory right to interest does not guarantee solvency, and adding a lawyer's fee without evidence of reasonable additional recovery cost weakens an otherwise sound claim.

  • Identify the legal parties and whether Section 5 B2B or Section 6 public-authority rules apply.
  • Prove the contract, supply, acceptance position and invoice or payment-request receipt.
  • Record the applicable due-date branch and any express payment or verification term.
  • Reconcile VAT, credit notes, instalments and all part-payments to the outstanding principal.
  • Split daily simple interest by half-year rate period and attach the official rate source.
  • State the €40 sum per qualifying transaction and substantiate additional reasonable costs.
  • Preserve demands, responses and a proportionate resolution timetable.

Basis and guidance: CyLaw consolidated Cyprus Law 123(I)/2012, including Law 227(I)/2022; Cyprus Ministry: official late-payment rate announcement, July–December 2026; Court of Justice: BFF Finance Iberia, C-585/20

Choose a complaint, negotiation or claim on the facts

Law 227(I)/2022 added Section 5A for B2B transactions. The supervisory Ministry may receive a written complaint about alleged breaches and may inform the complainant of the right to court action or encourage voluntary mediation. That is not an automatic debt-collection service or a judgment for the unpaid invoice. A commercial exchange, a payment plan or mediation may preserve a valuable customer relationship where the debtor accepts the amount but has a temporary cash-flow problem. Put any revised schedule in writing, reserve or settle interest and recovery sums expressly, and monitor performance. A negotiated solution should be deliberate rather than an accidental waiver created by ambiguous email wording.

If payment remains disputed or the debtor appears insolvent, get case-specific advice before spending heavily on proceedings. The choice of court, cross-border procedure, limitation period and eventual enforcement are different questions from whether late-payment interest accrued. An EU European Payment Order may be relevant to a qualifying cross-border uncontested claim, but it is not the legal source of the B2B rate and is not suitable merely because a Cyprus invoice is overdue. Likewise, Section 13 of the late-payment statute refers to obtaining an enforceable title in an uncontested case; it should not be read as a promise that every invoice is collected within ninety days. Evaluate evidence, forum, counterclaim risk, cost and collectible assets before selecting a procedure.

Basis and guidance: CyLaw consolidated Cyprus Law 123(I)/2012, including Law 227(I)/2022; EUR-Lex: Directive 2011/7/EU on late payment

Primary sources and scope

Sources checked: November 16, 2026. This guide concerns the Republic of Cyprus. Examples are hypothetical, not client case studies. Check current official requirements before making a filing.

Frequently asked questions

What is the Cyprus statutory B2B late-payment rate for July–December 2026?
The Cyprus Ministry's official notice gives 10.40% annually: the ECB main refinancing rate of 2.40% in force on 1 July plus eight percentage points. The Ministry lists 10.15% for January–June 2026. Check the rate for each half-year of delay.
Do I have to send a reminder before interest or the €40 becomes due?
No formal reminder is required under Sections 5(1) and 8(1) where the statutory conditions are met. A clear reminder is still useful to correct mistakes and document the claim.
When does interest start if the contract has no payment date?
Section 5(3)(b) uses an applicable thirty-calendar-day trigger based on invoice receipt, or goods/services receipt where invoice receipt is uncertain or early, or acceptance where a valid verification procedure applies. Identify the factual branch and keep evidence of its date.
Can a business customer insist on ninety-day terms?
Section 5(5) sets a sixty-calendar-day benchmark for B2B contractual periods. A longer period needs express agreement in the contract and must not be grossly unfair to the creditor under Section 9. Do not assume a buyer's standard portal setting satisfies those tests.
Is the €40 amount charged per reminder or per invoice?
It is a fixed recovery-cost sum when late-payment interest is payable, not a weekly reminder fee. The Court of Justice holds that it applies to each qualifying late commercial transaction evidenced by an invoice, including invoices collected in one combined claim.
Is VAT included in the amount on which interest is calculated?
The Cyprus statute defines the amount due to include applicable taxes and charges stated on the invoice. The Court of Justice has confirmed that invoiced VAT can be included even if the creditor had not yet remitted it when default began. Reconcile credit notes and the actual outstanding invoice balance.
Does the same thirty-day rule apply to a public authority?
Public-authority debtors fall under Section 6, with a distinct thirty-day framework and limited sixty-day exceptions. Identify the authority and any valid acceptance procedure; do not apply the B2B Section 5 calculation by default.
Can the Ministry collect my unpaid invoice after I complain?
Section 5A lets the supervisory Ministry receive written B2B complaints and potentially point to court action or encourage voluntary mediation. A complaint is not itself a payment order or debt collection judgment.

Prepared with AI assistance using the linked primary sources. This is not a claim of individual professional review. General information, not legal or tax advice. Editorial policy

Need tailored advice?

Request a free consultation. Zeno coordinates independent Cyprus Bar–licensed advocates and ICPAC–licensed accountants. We will reply with a proposed call time.

Request free consultation